• Facebook
  • Twitter
  • Live Traffic
  • Subscribe
  • Contact Us

I-30/SH360 Interchange Project

TxDOT Logo
  • Home
  • Overview
  • Roadwork
  • FAQ
  • News
  • Images
  • Links

Interchange Images

Resources

(Subject to Change)

IH-30 construction phasing

SH 360 construction phasing

Graphic Overlay of Future I-30

IH-30 pavement overlay

Graphic Overlay of Future SH360

SH360 pavement overlay

Aerials

January 2023
I-30 looking east at Ballpark Way interchange.
I-30 looking east at Ballpark Way interchange in foreground and SH 360 interchange in background.
I-30 looking west over Ballpark Way interchange at AT&T Way/Baird Farm Rd interchange in background.
I-30 looking west at SH 360 interchange.
I-30/SH 360 interchange looking northeast.
SH 360 looking north at I-30 interchange.
I-30 looking northwest over the Six Flags Drive and SH 360 interchanges.
I-30 looking west at SH 360 interchange in background.
I-30 looking west at Six Flags Dr and SH 360 interchanges in background.
I-30 looking southwest at Six Flags Drive and SH 360 interchanges.
I-30/SH 360 interchange looking southwest.
SH 360 looking southwest over Ave J interchange with I-30 interchange in background.
SH 360 looking south at I-30 interchange in background.
I-30/SH 360 interchange looking southeast.
I-30/SH 360 interchange looking east.
I-30/SH 360 interchange looking north.

September 2022
I-30 looking west at Six Flags Dr interchange in background.
I-30 looking west over Six Flags Dr interchange and SH 360 interchange in background.
I-30/Six Flags Dr interchange looking southwest. Construction continues for northbound Six Flags Dr across I-30.
SH 360 looking south over Brown Blvd/Ave K with Ave J interchange iin background.
SH looking south at Ave J interchange. Construction of SH 360 northbound frontage road, retaining walls, and ramp connection with highway on east side of SH 360 mainlane traffic.
I-30/SH 360 interchange looking southeast. Direct connector construction continues as steel girders extend connections.
I-30/SH 360 interchange looking east. View of steel girders stretching to connect ramps with yet to be connected sections.
I-30/SH 360 interchange looking northeast. Direct connector construction continues.
SH 360 looking north at I-30 interchange. Construction of direct connectors continues.
I-30 looking east over AT&T/Baird Farm Rd interchange.
I-30 looking east over Ballpark Way.
I-30 looking east at SH 360 interchange. Construction of direct connectors continues.
SH 360 looking north over Randol Mill Rd. Construction activity along SH 360 northbound frontage road is increasing.

June 2022
I-30/Ballpark Way interchange looking northwest.
I-30/SH 360 interchange looking northeast.
I-30/SH 360 interchange looking north.
I-30/SH 360 interchange looking northwest over the Six Flags Dr interchange.
I-30/Six Flags Dr interchange in foreground and I-30/SH 360 interchange in background.
I-30/Six Flags Dr interchange looking southwest. Bridge construction over I-30 and pavement construction between I-30 and Lamar Blvd is shown.
I-30/Six Flags Dr interchange looking east. Construction of future permanent I-30 westbound mainlanes shown on left side of highway.
I-30/SH 360 interchange looking west. Image shows construction of I-30 permanent westbound mainlanes and partial construction of new direct connectors.
I-30/SH 360 interchange looking south over Lamar Blvd. Construction of westbound Lamar Blvd pavement and partially constructed direct connectors is shown.
I-30/SH 360 interchange looking east. Image shows partially built direct connectors and construction of I-30 westbound permanent mainlanes.
SH 360 looking north over Lamar Blvd. Construction of northbound frontage road and direct connectors is shown.
SH 360 looking south at I-30 interchange. Construction of northbound frontage road and direct connectors is shown.
SH 360 looking north over Ave J interchange. Construction of northbound frontage road is shown.
SH 360 looking south over Ave J interchange shown in foreground. Construction of northbound frontage road and retaining walls facing northbound mainlanes is shown.
I-30 looking east over Ballpark Way interchange.

March 2022
I-3o/SH 360 interchange looking southwest over Six Flags Dr. Work on eastbound connector shown progressing.
I-30/SH 360 interchange looking southwest over Lamar Blvd. Progress shown building the west to north connector ramp.
SH 360 looking south over Lamar Blvd in foreground. Progress shown on west-to-north connector ramp
I-30 looking west with Ballpark Way interchange in foreground.
I-30 looking west with Ballpark Way interchange in mid-ground.
SH 360 looking south over Ave J in foreground. Construction focus between northbound frontage road and northbound mainlanes.
I-30/SH 360 interchnage looking southeast. Progress shown in northeast and southeast quadrants.
I-30/SH 360 interchange looking east-northeast over Six Flags. Progress shown on east side of SH 360.
SH 360 looking north at I-30 interchange in background.
I-30 looking west with Six Flags Dr interchange just outside background. Progress shown on removing I-30 westbound mainlanes for new construction.
I-30 looking west at Six Flags Dr interchange in midground. progress shown for I-30 westbound mainlane removal for new construction.
I-30/Six Flags Dr interchange looking southeast. Progress shown for Six Flags Dr bridge construction on east side and eastbound frontage road construction up to Six Flags Dr.

Jaunary 2022
SH 360 looking south over Ave J. Construction of SH 360 northbound frontage road and mainlanes shonw.
SH 360 looking north over Ave J at Brown Blvd/Ave K in background. Construction of new SH 360 frontage road and mainlanes shown.
SH 360 looking south over Johnson Creek and Lamar Blvd. Construction of SH 360 northbound frontage road and direct connector bridges from I-30 across Lamar Blvd is shown.
SH 360 looking south over I-30.
SH 360 looking south over Six Flags Dr.
I-30 looking east over SH 360. Construction of direct connector structures with SH 360 shown.
I-30/SH 360 interchange looking northwest over Six Flags Dr. Construction of direct connector structures shown.
I-30 looking west at Six Flags Dr interchange in background. Construction of future I-30 eastbound lanes is shown north of Ave F.
I-30/SH 360 interchange looking southwest over Six Flags Dr. Construction of east portion of Six Flags Dr bridge and direct connector bridge structures shown.
I-30 looking southwest over SH 360. Construction of I-30 westbound frontage road under SH 360 shown.
SH 360 and Lamar Blvd interchange looking northeast. Direct connector bridge structures shown under construction.
I-30 looking west over SH 360.
I-30 looking west at Ballpark Way interchange.
I-30 looking east over Ballpark Way interchange.

September 2021
I-30 looking west to SH 360 interchange in far background.
I-30/Six Flags Dr interchange looking southwest. Excavation and structure work shown.
I-30 interchanges with Six Flags Dr and SH 360. Excavation, wall construction, and bridge structure work shown.
SH 360 looking south at Ave J interchange in midground. New northbound frontage road and mainlane construction shown.
I-30/SH 360 interchange looking southeast over Lamar Blvd. New northbound frontage road over I-30, bridge structure work are shown.
I-30/Ballpark Way interchange looking east.
I-30 looking east to SH 360 interchange.
I-30/SH 360 interchange looking east. Construction activity focused east of SH 360.
SH 360 looking north at I-30 interchange.
I-30/SH 360 interchange looking northeast over Six Flags Dr. Excavation, wall construction, and bridge structures shown.
I-30 looking west over SH 360.

July 2021
I-30 looking west at Ballpark Way interchange.
I-30 looking east over Ballpark Way interchange.
I-30 looking east with SH 360 interchange in background.
SH 360 looking north at I-30 interchange. SH 360 northbound traffic on new permanent alignment.
I-30 and SH 360 interchange looking northwest over Six Flags Dr
I-30 looking west over Six Flags Dr interchange.
I-30 and Six Flags Dr interchange looking southwest.
SH 360 looking south over Ave J in foreground.
I-30 and SH 360 interchange looking southeast.

March 2021
I-30 looking west over Six Flags Dr interchange. New bridge substructure construction for Six Flags Dr underpass is shown.
I-30 looking west at SH 360 interchange. Focus shows significant progress for SH 360 northbound mainlane bridge over Six Flags Dr and I-30, and bridge substructure work for new SH 360 northbound frontage road bridge over I-30.
SH 360 looking south over I-30. Focus shows construction of new northbound mainlane bridges over Six Flags Dr and I-30. The start of bridge substructure construction for northbound frontage road bridge over I-30 is evident.
I-30 looking southwest between SH 360 and Ballpark Way.
I-30 looking east at SH 360 interchange.
I-30 looking northeast at Ballpark Way interchange.
SH 360 looking south at Johnson Creek crossing and I-30. SH 360 bridge construction at Lamar Blvd and Johnson Creek focused in photo.
I-30/SH 360 interchange looking southeast. Focus on construction of new SH 360 northbound bridges for mainlanes and frontage road.
I-30 looking east over SH 360. Focus on SH 360 northbound construction and direct connector bridge construction in northeast quadrant.
I-30/SH 360 interchange looking north over Six Flags Dr interchange. Focus construction on Six Flags Dr underpass west of existing Six Flags Dr bridge and construction of westbound direct connectors to SH 360.

January 2021
Over I-30 looking west with Ballpark Way interchange in mid-ground. Completed eastbound exit ramps to Copeland Rd/Six Flags Dr and the east-to-south direct connector are shown.
Over SH 360 looking south with Ave J interchange in mid-ground.
Over I-30 looking east with SH 360 interchange in mid-ground.
Over SH 360 looking north with I-30 interchange in background. SH 360 mainlane traffic shown on west side of alignment with large open space for new northbound mainlane construction.
I-30/SH 360 interchange looking northwest. Construction on north side of I-30 for new direct connectors for west-to-north and west-to-south shown being constructed.
Over I-30 looking west with Six Flags Dr interchange in foreground. Construction of new westbound direct connector ramp to north and south SH 360 shown being constructed, as well as new westbound frontage road west of Six Flags Dr intersection.
I-30/SH 360 interchange looking southwest over Lamar Blvd. Construction of new northbound mainlane bridge over Lamar Blvd shown.
I-30/SH 360 interchange looking southeast over Lamar Blvd. Construction of new northbound mainlane bridges over Lamar Blvd and I-30 are shown.
I-30/Ballpark Way interchange looking southeast.
I-30/Ballpark Way interchange looking northeast.

September 2020
SH 360 looking north at interchange with I-30. New southbound mainlanes shown in use and demolition of old southbound mainlanes shown.
I-30/SH 360 interchange looking down. Highlights demolition of old southbound mainlanes and new bridge structures in use.
I-30/Six Flags Dr interchange. Construction activity shown on north side of I-30 with construction of new westbound direct connector to north and south SH 360.
I-30/Six Flags Dr interchange looking northwest. Construction shown on Ave F and new permanent westbound exit to Six Flags Dr.
I-30 looking west over Six Flags Dr interchange. Construction of new direct connector to south and north SH 360 shown. Previous westbound exit to Six Flags Dr is removed.
I-30/SH 360 interchange looking southwest. New SH 360 southbound mainlane alignment in use.
SH 360 looking south with Lamar Blvd intersection in foreground. SH 360 traffic now using new bridge across I-30.
I-30/SH 360 interchange looking southeast. Traffic using new direct connector ramps connecting south-to-west and east-to-south.
I-30 looking west at Ballpark Way interchange.
I-30/Ballpark Way interchange looking southwest.
I-30 looking east with Ballpark Way interchange in foreground. Shows new eastbound exit to Six Flags Dr and direct connector ramps on west side of interchange.
I-30 looking northeast over Ballpark Way interchange. Shows exit ramps for eastbound to Six Flags Dr and east-to-south direct connector.
I-30 looking northeast at south-to-west direct connector now in service.
I-30/SH 360 interchange looking north northeast at new SH 360 southbound mainlane bridge in service and new direct connectors now in service.
I-30 looking west over Six Flags Dr. Shows median area that was reconstructed just west of SH 360 towards AT&T Way/Barid Farm Rd.

July 2020
Looking north over SH 360 south of I-30. New southbound mainlane construction shown.
Looking northeast at I-30/Six Flags Dr interchange. Construction on west side of Six Flags Dr crossing of I-30 shown.
Looking north at Six Flags Dr crossing I-30. Construction of new westbound exit ramp approach to Six Flags Dr shown.
Looking southwest at Six Flags Dr crossing I-30. Future westbound to north and south connector bridges construction shown.
Looking southwest at I-30/SH 360 interchange. Construction of new southbound mainlanes shown.
Looking south at I-30/SH 360 interchange. Construction of new southbound mainlanes shown.
Looking southwest at Copeland Rd construction.
Looking southwest at I-30/Ballpark Way interchange. Copeland Rd construction and new eastbound exit to Copeland Rd shown.
Looking east over I-30/Ballpark Way interchange. Construction of new eastbound exit to Copeland Rd shown.
Looking northwest at I-30/Ballpark Way interchange. Completion of westbound connection to southbound Ballpark Way and to westbound frontage road shown.
Looking south at SH 360/Ave J interchange. Construction of new southbound mainlane and connector approach shown.

March 2020
Ballpark Way interchange looking south with I-30 running left and right in mid-ground. Completed
I-30 looking east with Ballpark Way interchange in mid-ground.
I-30 looking east over Ballpark Way interchange. Construction for new eastbound Copeland Rd exit and northbound ramp from Ballpark Way is shown.
I-30 looking east at eastbound Copeland Rd exit nearly completed.
I-30 looking east at Copeland Rd construction progress on south side of I-30.
I-30 looking east northeast at interchange with SH 360. Completion of Johnson Creek bridges and pavement in the median is shown.
I-30/SH 360 looking northeast. Completion of Copeland Rd shown in foreground.
SH 360 looking north with Six Flags Dr interchange in mid-ground. Bridge construction for southbound mainlanes over Six Flags Dr is shown and work for new southbound mainlanes is shown.
Six Flags Dr east of SH 360 is shown with bridge subsctructure work on the north side of I-30 completed.
I-30 looking west east of Six Flags Dr access. Construction shown on Ave F and Ave G, and new retaining wall along Ave G for the new westbound Six Flags Dr exit ramp.
I-30 looking southeast over Ave G. Construction active on new retaining wall for the new westbound exit for Six Flags Dr.
Six Flags Dr interchange with I-30 looking southwest. Bridge substructures for future westbound direct connectors to SH 360 shown along north side of I-30.
SH 360 looking southwest at new SH 360 southbound mainlane bridge over I-30 and new entrance ramp from Lamar Blvd under construction.

January 2020
I-30 looking southwest with Ballpark Way interhcange in mid-ground. Active construction shown on Copeland Rd and new eastbound exit to Copeland Rd.
I-30 and Ballpark Way interchange looking southeast. View of new westbound I-30 frontage road to southbound Ballpark Way loop ramp connection.
I-30 looking east over AT&T Way/Baird Farm Rd with Ballpark Way interchange in mid-ground. New pavement seen in median where managed lanes will be located.
Looking north over SH 360 with I-30 in background. Can see active on the SH 360 southbound mainlane bridge and connection with directional connector ramps.
I-30/SH 360 interchange looking northwest. Construction of direct connector ramp substructures is shown on the north side of I-30.
I-30 looking west to I-30/SH 360 interchange. Construction shown on Ave F and Ave G.
I-30 looking west at I-30/SH 360 interchange. Construction of westbound direct connector substructures is shown on north side of I-30.
SH 360 looking south with I-30 in background, and Ave J in foreground. Construction of new SH 360 southbound mainlane bridge, pavement, and inside portion of southbound frontage road is shown.
SH 360 looking south with I-30 crossing in background. Construction shows work on SH 360 southbound mainlane bridge.
Showing I-30/SH 360 interchange looking southeast. Shows completed construction of median concrete paving and bridge over Johnson Creek.
I-30 looking west at I-30/SH 360 interchange. Construction showing Copeland Rd progress south of Johnson Creek.
I-30 looking west at Ballpark Way interchange in background. Shows construction of Copeland Rd between Ballpark Way and Johnson Creek and new westbound exit to Copeland Rd.

September 2019
I-30 construction looking north-northeast at Ballpark Way interchange.
I-30 construction at Ballpark Way interchange looking north. Completed westbound exit to southbound Ballpark Way.
I-30 construction looking northwest at Ballpark Way interchange. Construction on Copeland Rd, northbound Ballpark Way ramp to Copeland Rd, and new westbound Copeland Rd exit.
I-30 construction looking northeast at SH 360 underpass. Completed paving work Johnson Creek to west. New direct connector construction continuing.
I-30/SH 360 interchange looking northeast. Construction of Copeland Rd between Johnson Creek and Six Flags Dr. Construction of SH 360 southbound mainalne bridges.
Construction of SH 360 direct connector landings for SH 360 southbound mainlanes.
SH 360 looking north to I-30. Construction of direct connector landings for southbound SH 360 mainalnes.
SH 360 looking north to I-30. Construction of direct connector landings for SH 360 southbound mainlanes.
I-30/SH 360 interchange looking northwest with Six Flags Dr interchange in foreground.
I-30/SH 360 interchange looking northwest. Direct connector construction in northeast quadrant.
I-30 looking west to SH 360. Construction on Ave F and Ave G. Construction for westbound direct connectors.
I-30/SH 360 interchange looking southwest. Construction of direct connector ramps in northeast quadrant.
SH 360 looking at Ave J in southwest direction. Construction of southbound frontage road retaining walls north and south of Ave J.

June 2019
I-30/SH 360 interchange looking southeast. I-30 median bridge construction over Johnson Creek in foreground.
I-30 looking east with SH 360 crossing in foreground. New SH 360 southbound main lane bridge construction seen approaching I-30 from north.
I-30/SH 360 interchange looking northwest.
I-30/SH 360 interchange looking southwest.
SH 360 looking south over Ave J. Construction of new SH 360 southbound main lanes and bridges seen.
I-30/Ballpark Way interchange looking south. New construction of cloverleaf ramp to southbound Ballpark Way seen.
I-30/Ballpark Way interchange over I-30 looking east. Ballpark Way in foreground.
I-30 over Ballpark Way looking northeast. Construction of new Copeland Rd and new eastbound exit to Copeland Rd seen.
I-30/SH 360 interchange looking northeast. Construction of east-to-south direct connector south of Six Flags Dr seen.
I-30/SH 360 interchange looking north over Six Flags Dr in foreground. Construction of new SH 360 southbound main lanes seen.
I-30/SH 360 interchange over Six Flags Dr looking west. Construction of westbound direct connectors on north side of I-30 seen.

March 2019
I-30/SH 360 interchange looking northwest with Six flags Dr connection ramps in foreground.
I-30 looking west with Six Flags Drive interchange in mid-ground.
I-30 looking east from east of the Six Flags Drive interchange.
SH 360 looking south with Ave J crossing in foreground.
I-30/SH 360 interchange looking southwest with Lamar Boulevard and southbound bound frontage road intersection in mid-ground.
I-30 looking east from east of Ballpark Way.
I-30 looking west with Ballpark Way crossing in background.
Ballpark Way crossing of I-30 looking southwest.
Ballpark Way crossing I-30 looking southeast.
I-30 looking east with Ballpark Way cross in background.
I-30 looking east northeast with SH 360 interchange in background.
SH 360 looking north with Six Flags Drive crossing in mid-ground.

January 2019
I-30 looking southwest with Ave F and G parallel to highway
I-30/SH 360 interchange looking southwest
SH 360 looking south over Ave J with Lamar Blvd in mid-ground
SH 360 looking north with Ave J in mid-ground
I-30/SH 360 interchange looking southeast with Lamar Blvd in foreground
I-30/SH 360 interchange looking west with SH 360 in midground
I-30/SH 360 interchange looking north with Six Flags Dr in foreground
I-30/SH 360 interchange looking west with SH 360 southbound frontage road in foreground
I-30 reconstruction looking east southeast with Ballpark Way in background
I-30/Ballpark Way interchange looking southeast

October 2018