Typical closure times are 9:00 a.m. to 3:00 p.m. for weekday closures and 7:00 p.m. to 6:00 a.m. for weeknight closures. Lane closures are allowed all day Saturday, and Sunday (as needed).
Please note closures are subject to changes due to weather and schedule.
I-30 Mainlanes & Ramps
- I-30 Westbound Mainlanes
- Nightly, Jun 2-30, 8p-5a: I-30 westbound mainlanes may be closed between Six Flags Dr and Ballpark Way for bridge painting. Traffic will be detoured to exit Six Flags Dr and continue on the I-30 westbound frontage road to re-enter from the AT&T Way/Baird Farm Rd entrance ramp. EXPECT SIGNIFICANT DELAYS. SEEK ALTERNATE ROUTE.
- I-30 Eastbound Mainlanes
- Nightly, Jun 2-30, 8p-5a: I-30 eastbound mainlanes may be closed between SH 360 and Six Flags Dr for bridge painting. Traffic will be detoured to exit Six Flags Dr and continue on the I-30 eastbound frontage road to re-enter from the Six Flags Dr entrance ramp. . EXPECT SIGNIFICANT DELAYS. SEEK ALTERNATE ROUTE.
- I-30 Eastbound Exit to SH 360 Southbound
- Effective Aug 9, 2020: This direct connector ramp from I-30 eastbound mainlanes to SH 360 southbound mainlanes was placed into service.
- I-30 Eastbound Exit to SH 360 Northbound
- Effective, May 6, 2023: This direct connector ramp from I-30 eastbound mainlanes to SH 360 northbound mainlanes was placed into service.
- I-30 Eastbound Exit to SH 360/Six Flags Dr
- I-30 Westbound Entrance from SH 360/Six Flags Dr
- Effective Sep 2, 2022: The I-30 westbound entrance ramp from SH 360/Six Flags Dr was returned to service.
- Effective Aug 26, 2020: A new traffic signal is active at the intersection with the new, permanent I-30 westbound exit ramp to SH 360/Six Flags Dr. Traffic passes through this signalized intersection to access the westbound I-30 entrance ramp. BE AWARE OF NEW TRAFFIC PATTERN.
- I-30 Westbound Exit to SH 360 Northbound
- Nightly, Jun 2-30, 8p-5a: The I-30 west to SH 360 north direct connector ramp may be closed for bridge painting. Traffic will be directed to exit the preceding exit to SH 360/Six Flags Dr and follow detour signs.
- Effective Oct 1, 2022: This direct connector ramp from I-30 westbound mainlanes to SH 360 northbound mainlanes was placed into service.
- I-30 Westbound Exit to SH 360 Southbound
- Effective, Mar 21, 2023: The direct connector ramp from I-30 westbound to SH 360 southbound mainlanes was placed into service.
- I-30 Westbound Exit to SH 360/Six Flags Dr
- Effective Aug 26, 2020: A new I-30 westbound exit ramp to SH 360/Six Flags Dr is open to traffic, replacing the previous loop exit ramp. Traffic makes a left turn through a signalized intersection to continue across I-30 towards SH 360. BE AWARE OF NEW TRAFFIC PATTERN.
- I-30 Eastbound Entrance from Convention Center Dr/Copeland Rd Intersection
- PERMANENT: The eastbound I-30 entrance ramp available from the Convention Center Dr/Copeland Rd intersection is closed permanently. Traffic will continue to have access to the ramp to northbound Ballpark Way.
- I-30 Eastbound Entrance from Northbound Ballpark Way
- PERMANENT: The eastbound I-30 entrance ramp from northbound Ballpark Way is closed permanently. This ramp now serves as an uninterrupted ramp to eastbound Copeland Rd.
- I-30 Westbound Frontage Road
- Daily, May 30-Jun 3, 9a-3p: The I-30 westbound frontage road between Six Flags Dr and SH 360will be closed for general construction. Traffic will be detoured onto I-30 westbound mainlanes at the entrance ramp from Six Flags Dr and exit for Ballpark Way.
- Nightly, Jun 2-30, 8p-5a: The I-30 westbound frontage road between Six Flags Dr and SH 360 may be closed for bridge painting. Traffic will be detoured north to Lamar Blvd, then west to Baird Farm Rd, and south to return to the I-30 westbound frontage road.
- Effective Feb 11, 2022: The I-30 westbound frontage road between Six Flags Dr and Ballpark Way was opened.
- I-30 Eastbound Frontage Road
- Daily, May 31-Jun 5, 9a-3p: The left, inside lane of the I-30 eastbound frontage road between Copeland Rd and Six Flags Dr will be closed for general construction.
- Nightly, Jun 2-30, 8p-5a: The I-30 eastbound frontage road between Copeland Rd and Six Flags Dr may be closed for bridge painting. Traffic will be detoured to eastbound Six Flags Dr.
- Effective Oct 15, 2022: The I-30 eastbound frontage road between Copeland Rd and Six Flags Dr was placed into service.
I-30 HOV Lanes (between Great Southwest Pkwy and Cooper St)
- Westbound I-30 HOV lane west of SH 161
- Effective Nov 4, 2016: The westbound HOV lane west of SH 161 is closed. TEXpress lane traffic is directed into the I-30 westbound general main lanes west of SH 161.
- Eastbound I-30 HOV lane between Center St and Duncan Perry Rd
- Effective Oct 14, 2016: The eastbound HOV lane access near Center St and lane through Tarrant County is closed. TEXpress lane traffic will enter at SH 161.
SH 360 Mainlanes & Ramps
- SH 360 Southbound Mainlanes
- Nightly, Jun 2-30, 8p-5a: The SH 360 southbound mainlanes may be closed between Ave J and Six Flags Dr for bridge painting. Traffic will be detoured to exit Ave J/Lamar Blvd/Six Flags Dr, continue on the SH 360 southbound frontage road to re-enter from the ramp from Lamar Blvd. EXPECT SIGNIFICANT DELAYS. SEEK ALTERNATE ROUTE.
- SH 360 Northbound Mainlanes
- Nightly, Jun 2-30, 8p-5a: The SH 360 northbound mainlanes may be closed between Ave J and Six Flags Dr for bridge painting. Traffic will be detoured to exit Six Flags Dr, continue on the SH 360 northbound frontage road to re-enter from the ramp from Brown Blvd/Ave K. EXPECT SIGNIFICANT DELAYS. SEEK ALTERNATE ROUTE.
- SH 360 Southbound Entrance from Brown Blvd/Ave K
- PERMANENT: The SH 360 southbound entrance from Brown Blvd/Ave K is PERMANENTLY CLOSED. Traffic is detoured along the SH 360 southbound frontage road to enter from the Six Flags Dr entrance ramp. A new entrance ramp was constructed between Lamar Blvd and Six Flags Dr.
- SH 360 Northbound Exit to Brown Blvd/Ave K
- PERMANENT: Dec 5, 2021: The SH 360 northbound exit to Brown Blvd/Ave K is PERMANENTLY CLOSED to construct a new entrance ramp between Ave J and Brown Blvd/Ave K. Traffic will be directed to exit Six Flags Dr and continue on the SH 360 northbound frontage road to Brown Blvd/Ave K.
- SH 360 Northbound Entrance from Ave J
- Effective May 3, 2023: The new, SH 360 northbound entrance from Ave J was placed into service.
- SH 360 Northbound Entrance from Lamar Blvd
- PERMANENT: Dec 6, 2021: The SH 360 northbound entrance from Lamar Blvd is PERMANENTLY CLOSED. Traffic will be detoured along the SH 360 northbound frontage road to enter from the Brown Blvd/Ave K entrance ramp. A new permanent entrance ramp will be constructed between Ave J and Brown Blvd/Ave K.
- SH 360 Southbound Exit to Ave J/Lamar Blvd/Six Flags Dr/Randol Mill Rd
- Effective Aug 1, 2020: A new SH 360 southbound exit ramp to Ave J/Lamar Blvd is open to traffic.
- SH 360 Southbound Exit to I-30 Westbound
- Nightly, Jun 2-30, 8p-5a: The SH 360 southbound exit to I-30 westbound may be closed for bridge painting. Traffic will be detoured east on I-30 to exit SH 161, cross I-30, and return on the I-30 westbound mainlanes. EXPECT DELAYS.
- Effective Aug 1, 2020: This direct connector ramp is open to traffic.
- SH 360 Southbound Exit to I-30 Eastbound
- Nightly, Jun 2-30, 8p-5a: The SH 360 southbound exit to I-30 westbound will be closed for bridge painting. Traffic will be detoured to exit Ave J/Lamar Blvd/Six Flags Dr, continue on the SH 360 southbound frontage road, turn west on Lamar Blvd, and turn south on Baird Farm Rd to return to the I-30 westbound frontage road.
- Effective Mar 17, 2023: The direct connector ramp from SH 360 southbound to I-30 eastbound was placed into service.
- SH 360 Southbound Exit to Lamar Blvd
- PERMANENT: The SH 360 southbound exit to Lamar Blvd is PERMANENTLY CLOSED. Traffic now uses a new exit ramp for Ave J/Lamar Blvd/Six Flags Dr.
- SH 360 Southbound Entrance from Lamar Blvd
- Nightly, Jun 2-30, 8p-5a: The SH 360 southbound entrance ramp from Lamar Blvd will be closed in coordination with the SH 360 southbound mainlanes closure for bridge painting. Traffic will be directed to the next entrance ramp from Six Flags Dr.
- Effective Jun 29, 2021: The new, permanent SH 360 southbound entrance from Lamar Blvd is in service.
- SH 360 Northbound Exit to Lamar Blvd
- Effective May 1, 2023: The SH 360 northbound exit to Lamar Blvd was placed into service.
- SH 360 Southbound Entrance from Six Flags Dr
- PERMANENT Apr 28, 2023: The temporary SH 360 southbound entrance from Six Flags Dr was permanently removed from service. Traffic is directed to the next entrance from SH 180/Division St.
- SH 360 Northbound Exit to I-30/Six Flags Dr/Lamar Blvd/Ave J
- Effective Jan 6, 2021: The SH 360 northbound exit to I-30/Six Flags Dr/Lamar Blvd/Ave J was moved to a new, temporary exit ramp. BE AWARE OF NEW TRAFFIC PATTERN.
- Anticipated, Spring 2023: The SH 360 northbound exit to I-30/Six Flags Dr/Lamar Blvd/Ave J will be closed after the SH 360 northbound exit to Lamar Blvd/Ave J/Brown Blvd is opened for service. This will be a permanent closure. Six Flags Dr traffic will then be directed to exit for SH 180/Division St/Randol Mill Rd/Six Flags Dr.
SH 360 Frontage Road
- SH 360 Southbound Frontage Road
- Lamar Blvd to Six Flags Dr
- Nightly, Jun 2-30, 8p-5a: The SH 360 southbound frontage road between Lamar Blvd and Six Flags Dr may be closed for bridge painting. Traffic will be detoured westbound on Lamar Blvd to Baird Farm Rd, south on Baird Farm Rd to Copeland Rd, and east on Copeland Rd to return to Six Flags Dr. EXPECT DELAYS.
- SH 360 South-to-North U-turn at Lamar Blvd
- Effective Nov 8, 2018: The SH 360 south-to-north U-turn at Lamar Blvd will be closed while the SH 360 mainlanes and northbound frontage road are under construction.
- SH 360 South-to-North U-turn at Six Flags Dr
- Effective Nov 8, 2018: The SH 360 south-to-north U-turn at Six Flags Dr will be closed while the SH 360 mainlanes and northbound frontage road are under construction.
- Lamar Blvd to Six Flags Dr
- SH 360 Northbound Frontage Road
- Six Flags Dr to Lamar Blvd
- Continuously, Jun 9, 8p-Jun 12, 5a: The SH 360 northbound frontage road between Six Flags Dr and Lamar Blvd may be closed for bridge construction. Traffic will be detoured eastbound on Six Flags Dr, cross over I-30, and return on westbound Lamar Blvd to the SH 360 northbound frontage road. EXPECT DELAYS.
- Nightly, Jun 2-30, 8p-5a: The SH 360 northbound frontage road between Six Flags Dr and Lamar Blvd may be closed for bridge painting. Traffic will be detoured eastbound on Six Flags Dr, cross over I-30, and return on westbound Lamar Blvd to the SH 360 northbound frontage road. EXPECT DELAYS.
- SH 360 North-to-South U-turn at Six Flags Dr
- Effective Nov 8, 2018: The SH 360 north-to-south U-turn at Six Flags Dr will be closed while the SH 360 mainlanes and northbound frontage road are under construction.
- Six Flags Dr to Lamar Blvd
Local Streets
- Copeland Rd
- PERMANENT: Effective Oct 13, 2016, Copeland Rd between Six Flags Dr and the SH 360 southbound frontage road is permanently closed.
- PERMANENT: Effective Mar 14, 2016, westbound Copeland Rd from Six Flags to just east of Ballpark Way is permanently closed. Only eastbound Copeland Rd traffic is allowed between Ballpark Way and Six Flags Dr.
- Six Flags Dr
- Continuously, Jun 9, 8p-Jun 12, 5a: Eastbound Six Flags Dr under SH 360 will be closed for bridge construction. Eastbound traffic will be detoured onto SH 360 southbound frontage road, cross under SH 360 at Randol Mill Rd, and return on the SH 360 northbound frontage road.
- Continuously, Jun 9, 8p-Jun 12, 5a: Westbound Six Flags Dr between I-30 and SH 360 will be closed. Westbound traffic will be detoured north to Lamar Blvd, then west on Lamar Blvd to the SH 360 southbound frontage road to return to Six Flags Dr. EXPECT DELAYS.
- Nightly, Jun 2-30, 8p-5a: Eastbound and westbound Six Flags Dr may be closed under SH 360 for bridge construction. Eastbound traffic will be detoured onto SH 360 southbound frontage road, cross under SH 360 at Randol Mill Rd, and return on the SH 360 northbound frontage road. Westbound traffic will be detoured onto SH 360 northbound frontage road, cross under SH 360 at Lamar Blvd, and return on SH 360 southbound frontage road. EXPECT DELAYS.
- Effective May 23, 2023: Eastbound and westbound Six Flags Dr are reduced to one lane each direction between Copeland Rd and I-30. EXPECT DELAYS. WATCH FOR NEW TRAFFIC PATTERN.
- Convention Center Dr/Copeland Rd Intersection
- PERMANENT: The I-30 eastbound entrance ramp available from this intersection was removed permanently from service. Access to northbound Ballpark Way is maintained.
- 105th St
- PERMANENT: 105th St between Six Flags Dr and Ave E is permanently closed.