Typical closure times are 9:00 a.m. to 3:00 p.m. for day closures and 8:00 p.m. to 5:00 a.m. for night closures.
Please note closures are subject to changes due to weather and schedule.
I-30 Closures
Roadway | From | To | Description | Work Activity |
---|---|---|---|---|
I-30 Eastbound Mainlanes (Ballpark Way to SH 360) |
Oct 22 | Oct 23 | Daily, 9a-3p: The left, inside lane of eastbound I-30 from Ballpark Way to SH 360 will be closed. | Truck access. |
I-30 Eastbound Entrance from Copeland Rd | Aug 27 | Fall 2020 | A temporary eastbound I-30 entrance ramp is open and accessible from Copeland Rd between Ballpark Way and SH 360. | |
I-30 Eastbound Entrance from Convention Center Dr/Copeland Rd Intersection | Aug 24, 10p | Permanent | The eastbound I-30 entrance ramp available from the Convention Center Dr/Copeland Rd intersection will be closed permanently. Traffic will continue to have access to the ramp to northbound Ballpark Way. | Construct permanent westbound I-30 exit to Copeland Rd east of Ballpark Way. |
I-30 Eastbound Entrance from Northbound Ballpark Way | Aug 24, 10p | Permanent | The eastbound I-30 entrance ramp from northbound Ballpark Way will be closed permanently. | Build new ramp connection to Copeland Rd. |
I-30 Westbound Exit to Ballpark Way/Baird Farm Rd |
July 7, 2018 | Permanent | The I-30 westbound exit to Ballpark Way/Baird Farm Rd is moved further east, closer to SH 360, with traffic now approaching the Ballpark Way intersection from the east side of the roadway. The existing loop ramp is under reconstruction. | |
Westbound I-30 HOV Lane | Nov 4, 2016 | Fall 2020 | Westbound I-30 HOV lane west of SH 161 is closed. TEXpress lane traffic is directed into the I-30 westbound general main lanes west of SH 161. | Construction of bridge structures for interchange. |
Eastbound I-30 HOV Lane | Oct 14, 2016 | Fall 2020 | Eastbound I-30 HOV lane access near Center St is closed. TEXpress lane traffic will enter at SH 161. | Construction of bridge structures for interchange. |
SH 360 Closures
Roadway | From | To | Description | Work Activity |
---|---|---|---|---|
SH 360 Southbound and Northbound Mainlanes (Abram St to Mitchell St) |
Nov 2, 7p | Nov 5, 6a | Both northbound and southbound SH 360 mainlanes will be closed approaching Abram St. Southbound SH 360 will be forced to exit for SH 180/Divsiion St and continue on the southbound frontage road to re-enter from the Abram St entrance ramp. Northbound SH 360 will be forced to exit to Abram St and continue on the northbound frontage road to re-enter from the SH 180/Division St entrance ramp. SEEK ALTERNATE ROUTES. EXPECT DELAYS. | Partial bridge removal of SH 360 at Abram St. |
SH 360 Southbound Frontage Road (Brown Blvd/Ave K to Johnson Creek) |
Nov 10, 2017 | Feb 2019 | The SH 360 southbound frontage road is reduced to one lane from Brown Blvd/Ave K to Johnson Creek. | Reconstruction of new SH 360 southbound frontage road and access with southbound SH 360. |
SH 360 Southbound Frontage Road (Six Flags Dr to Randol Mill Rd) |
Aug 11 | Oct 29 | Continuously: The right, outside lane of the SH 360 southbound frontage road between Six Flags Dr and Randol Mill Rd will be closed. | Roadway construction. |
Southbound-to-Northbound U-turn at Mayfield Rd | Oct 1 | Nov 2 | Continuous: The SH 360 frontage southbound-to-northbound U-turn at Mayfield Rd will be closed. | Bridge construction. |
Northbound-to-Southbound U-turn at Mayfield Rd | Oct 1 | Nov 2 | Continuous: The SH 360 frontage northbound-to-southbound U-turn at Mayfield Rd will be closed. | Bridge construction. |
Local Streets
Roadway | From | To | Description | Work Activity |
---|---|---|---|---|
Northbound Ballpark Way (I-30 to Wet-n-Wild Way) |
May 2017 | Winter 2019 | The right, outside lane of northbound Ballpark Way between I-30 and Brinker Ct will be closed. | Construct new connection with westbound I-30 frontage road. |
Ave J | Sep 19, 2018 | Fall 2018 | Eastbound and westbound Ave J are shifted to the north side of the roadway. | Construct new intersection of SH 360 southbound frontage road and Ave J. |
Lamar Blvd | Oct 20, 9a | Oct 20, 12p | The right outside lanes of eastbound and westbound Lamar Blvd between SH 360 and Brookhollow Plaza Dr will be closed. | Traffic signal construction. |
Ave G | Nov 2016 | Fall 2018 | 800 block of Ave G is limited to westbound traffic only. | Reconstruction of Ave G |
Ave F (Ave E to 111th St) | Apr 6, 2016 | Fall 2018 | Eastbound and westbound traffic will be reduced to one lane each direction and shifted to the south side of Ave F. | Reconstruction of Ave F. |
Copeland Rd (Westbound) | Mar 14, 2016 | Permanent | Westbound Copeland Rd between Six Flags Dr and Ballpark Way is closed. | Permanent reconfiguration of traffic movement on this section of Copeland Rd. |
Copeland Rd (Eastbound) | Aug 24 | Fall 2019 | Eastbound Copeland Rd between Ballpark Way and Six Flags Dr is reduced to one lane and forced onto eastbound I-30. | Copeland Rd reconstruction to Six Flags Dr. |
Diplomacy Dr | Oct 8 | Oct 29 | Continuous: The intersection of Diplomacy Dr with the SH 360 southbound frontage road will be closed. | Intersection pavement construction. |
Abram St (At SH 360) |
Nov 2, 7p | Nov 5, 6a | Abram St eastbound and westbound traffic will be detoured along the SH 360 frontage roads to turn around at Mitchell St and SH 180/Division St. No access will be permitted under SH 360. SEEK ALTERNATE ROUTES. EXPECT DELAYS. |
Sign up for free e-news on project lane closures, detours, and outreach activities. Your information will not be used for marketing.