Aerials

July 2021
SH 360 looking north at the Green Oaks Blvd and I-20 interchanges.
SH 360 looking north over the I-20 interchange.
SH 360 looking north over the Mayfield Rd interchange.
SH 360 looking north over the SP 303 interchange.
SH 360 north over the Park Row Dr interchange.
SH 360 looking north at the Abram St interchange.

March 2021
SH 360 looking north at Arkansas Ln and SP 303 interchanges. Completed interior lane in use.
SH 360 looking north over SP 303 interchange. Completed interior lane in use. Completed sound walls shown along northbound frontage road and northbound entrance ramp.
SH 360 looking north over Park Row Dr interchange. Completed interior lane in use.
SH 360 looking north with Abram St interchange in background. Completed interior lane and new access ramps south of Abram St in use.
SH 360 looking north over Abram St interchange. Completed interior lane and access ramps north of Abram St in use.
SH 360 looking north over SH 180/Division St interchange.
SH 360 looking south over I-20 interchange with Bardin Rd interchange in foreground. Completed interior lanes in use.
SH 360 looking north over I-20 interchange. Completed interior lanes in use.
SH 360 looking north at Mayfield Rd interchange. Completed interior lanes in use.
SH 360 looking north over Mayfield Rd interchange. Completed interior lanes in use and completed sound wall construction on southbound frontage road.

January 2021
SH 360 looking north over Park Row Dr.
SH 360 looking north at SP 303 interchange.
SH 360 looking north over Mayfield Rd at Arkansas Ln interchange in background.
SH 360 looking north at Mayfield Rd interchange in background.
SH 360 looking north at I-30 interchange and Bardin Rd interchange.
SH 360 looking north over Green Oaks Blvd/Kingswood Blvd.
SH 360 looking north over Abram St interchange. Interior bridge construction shown near completion.

September 2020
SH 360 looking north at Mayfield Dr interchange. Completed inside construction shown.
SH 360 looking north over Mayfield Dr interchange. Arkansas Ln and SP 303 interchanges shown in background. Completion of inside lane construction shown.
SH 360 looking north at Arkansas Ln and SP 303 interchanges. Completion of inside lane construction shown.
SH 360 looking north over SP 303 interchange. Completion of inside lane construction shown. Work on sound walls along northbound frontage road shown.
SH 360 looking north at Mitchell Rd underpass. Construction of new inside lanes shown.
SH 360 looking north at Abram St interchange. Construction o new inside lanes approaching Abram St overpass shown. Construction continuing on SH 360 bridges over Abram St.
SH 360 looking north over Green Oaks Blvd/Kingswood Blvd. Inside lane construction completed from ramps north of interchange.
SH 360 looking north at I-20 interchange. Completion of inside lane construction shown.

July 2020
Looking north at SH 360/Abram St interchange. Completed demolition of old highway over Abram St shown.
Looking north over SH 360/Park Row Dr interchange. Completed interior widening over Park Row Dr shown.
Looking north over SH 360/Arkansas Ln interchange. Interior widening shown.
Looking north over SH 360/Mayfield Dr interchange. Completed interior widening shown.
Looking north over SH 360/I-20 interchange. Completed interior pavement widening shown.
Looking north over SH 360/Kingswood Blvd. Completed interior widening from access ramps to north shown.

March 2020
SH 360 looking north over Mayfield Rd. Construction of sound walls between the southbound frontage road and southbound mainlanes is shown.
SH 360 looking north with Arkansas Ln underpass in foreground. Construction in the median is shown.
SH 360 looking north over Pioneer Pkwy. Construction in the median in shown.
SH 360 looking north over Mitchell St. Construction of new southbound concrete mainlanes and new entrance ramp from Abram St is shown.
SH 360 looking north over Abram St. New southbound mainlanes bridges shown on outside of current active mainlanes.
SH 360 looking north over Kingswood Blvd. Construction in median and sound wall construction on outside of southbound frontage road is shown.
SH 360 looking north with Bardin Rd underpass shown in foreground. Construction shown in median.
SH 360 looking north over I-20 interchange. Construction of new inside concrete lanes is shown in the median.
SH 360 looking north at Mayfield Rd overpass in mid-ground. Construction of new inside concrete lanes is shown in the median.

January 2020
SH 360 looking north over Kingswood Blvd. Shows construction of inside lane pavement north through I-20 interchange.
SH 360 looking north with I-20 interchange in foreground. Shows inside lane construction north toward Mayfield Rd.
SH 360 looking north over Mayfield Rd in foreground. Shows completed inside pavement construction north to Arkansas Ln and new interior overpass lanes over Mayfield Rd.
SH 360 looking north with Arkansas Ln interchange in mid-ground. Shows new inside lane construction to Arkansas Ln and preparations from Arkansas Ln to the north.
SH 360 looking north over SP 303 interchange with Park Row Dr in mid-=ground. Shows interior lane construction south of Park Row Dr to Park Row Dr new interior overpass lanes.
SH 360 looking north with Mitchell St crossing in foreground. Construction of Abram St southbound entrance ramp and northbound exit ramp is shown.
SH 360 looking north over Abram St. Shows construction of outside SH 360 bridge lane over Abram St and preparations for new pavement for southbound entrance from Division St and northbound exit to Division St.

September 2019
SH 360 looking north at the Division St interchange. Construction of new access ramps is shown in foreground.
SH 360 looking north at Mitchell St and Abram St. Construction of new mainlanes between Mitchell St and Abram St.
SH 360 looking north at Park Row Dr interchnage. New interior bridge structure on southbound mainlane side. Preparations for new northbound interior bridge structure.
SH 360 looking north at Pioneer Pkwy interchange. Soil improvements occurring in median.
SH 360 looking north at Arkansas Ln and Pioneer Pkwy interchanges. Construction of interior lanes in median is shown.
SH 360 looking north at Mayfield Rd interchange. Construction of interior bridge structures and median pavement work north and south of Mayfield Rd.
SH 360 looking north with Cummins St in foreground. Construction of southbound interior concrete lane and preparations for northbound lane shown.
SH 360 looking north at I-20 interchange. Construction of southbound interior concrete lane and preparations for northbound lane shown.
SH 360 looking north over Kingswood Blvd. Construction of southbound interior concrete lane and preparations for northbound lane shown.

June 2019
SH 360 looking north over Kingswood Blvd.
SH 360 looking north with I-20 interchange in mid-ground.
SH 360 looking north with Mayfield Rd interchange in mid-ground. Interior widening construction seen.
SH 360 looking north with Arkansas Ln and Pioneer Pkwy in background. Interior widening construction seen.
SH 360 looking north with Pioneer Pkwy in mid-ground. Interior widening construction seen.
SH 360 looking north with Michell St in mid-ground and Abram St in background. Interior widening construction seen.
SH 360 looking north over Mitchell St with Abram St in background. Exterior widening seen

March 2019
SH 360 looking north at I-20 interchange in mid-ground.
SH 360 looking north with Mayfield Road crossing in background.
SH 360 looking north with Mayfield Road crossing in foreground.
SH 360 looking north with Arkansas Lane crossing in foreground.
SH 360 looking north with Park Row Drive crossing in background.
SH 360 looking north above Park Row Drive.
SH 360 looking north with Abram Street crossing in mid-ground.
SH 360 looking north above Division Street.
SH 360 looking north above Kingswood Boulevard.

January 2019
SH 360 looking north at Division St crossing. Construction between frontage roads and mainlanes.
SH 360 looking north. Mitchel St in mid ground. Construction between frontage roads and mainlanes.
SH 360 looking north. Park Row Dr in mid-gorund.
SH 360 looking north. Pioneer Pkwy in mid-ground.
SH 360 looking north. Arkansas Ln and Pioneer Pkwy in background.
SH 360 looking north. Mayfield Rd in mid-ground. Construction between mainlanes up to Mayfield Rd.
SH 360 looking north, north of I-20. Construction between mainlanes.
SH 360 loooking north. Bardin Rd in mid-ground. Construction between mainlens.
SH 360 looking north over Kingswood Blvd. Construction between mainlanes north of Kingswood Blvd.

October 2018
SH 360 Looking north over SH 180/Division St.
SH 360 Looking north over Mitchell St
SH 360 Looking north over SP 303
SH 360 Looking north with Arkansas Ln in foreground
SH 360 Looking north with Mayfield Rd in foreground
SH 360 Looking north over I-20 interchange with Cummins St in foreground
SH 360 Looking north over Kingswood Blvd

May 2018