• Facebook
  • Twitter
  • Live Traffic
  • Subscribe
  • Contact Us

I-30/SH360 Interchange Project

TxDOT Logo
  • Home
  • Overview
  • Roadwork
  • FAQ
  • News
  • Images
  • Links

What are the major improvements of the project?

June 24, 2018 by

The project widened the 5.4-mile section of SH 360 of mainlanes from three lanes to four lanes by adding an additional north and southbound mainlane, widened the SH 360 bridges at Park Row Drive and Mayfield Road, fully rebuilt the SH 360 bridge over Abram Street and rebuilt the exit and entrance ramps at Abram Street.

What is the project’s cost?

June 24, 2018 by

The project was awarded for $53 million.

What are the project limits?

June 24, 2018 by

The limits of the project were on SH 360 from Abram Street to Kingswood Boulevard/Green Oaks Boulevard.

  • « Previous Page
  • 1
  • 2

Copyright © 2025

Texas A&M Transportation Institute
Texas A&M University System