The project widened the 5.4-mile section of SH 360 of mainlanes from three lanes to four lanes by adding an additional north and southbound mainlane, widened the SH 360 bridges at Park Row Drive and Mayfield Road, fully rebuilt the SH 360 bridge over Abram Street and rebuilt the exit and entrance ramps at Abram Street.
What is the project’s cost?
The project was awarded for $53 million.
What are the project limits?
The limits of the project were on SH 360 from Abram Street to Kingswood Boulevard/Green Oaks Boulevard.